Pages that link to "Item:Q856222"
From MaRDI portal
The following pages link to Multi-period planning and uncertainty issues in cellular manufacturing: a review and future directions (Q856222):
Displayed 9 items.
- Designing a mathematical model for dynamic cellular manufacturing systems considering production planning and worker assignment (Q611406) (← links)
- A fuzzy programming approach for a cell formation problem with dynamic and uncertain conditions (Q834458) (← links)
- A multi-objective scatter search for a dynamic cell formation problem (Q955612) (← links)
- The evolution of cell formation problem methodologies based on recent studies (1997-2008): Review and directions for future research (Q976478) (← links)
- Robust optimization of internal transports at a parcel sorting center operated by Deutsche Post world net (Q1037666) (← links)
- Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing (Q1761211) (← links)
- A SIMULATED ANNEALING FOR INTRA-CELL LAYOUT DESIGN OF DYNAMIC CELLULAR MANUFACTURING SYSTEMS WITH ROUTE SELECTION, PURCHASING MACHINES AND CELL RECONFIGURATION (Q2853403) (← links)
- Cellular manufacturing systems design with routing flexibility, machine procurement, production planning and dynamic system reconfiguration (Q3623401) (← links)
- SOME UNDERLYING MATHEMATICAL DEFINITIONS AND PRINCIPLES FOR CELLULAR MANUFACTURING (Q5411734) (← links)