Pages that link to "Item:Q856680"
From MaRDI portal
The following pages link to Makespan minimization in a no-wait flow shop problem with two batching machines (Q856680):
Displaying 9 items.
- Minimizing makespan for multi-spindle head machines with a mobile table (Q954031) (← links)
- A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times (Q1046715) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- Two-stage hybrid flow shop scheduling with dynamic job arrivals (Q1762160) (← links)
- Integrated problem of soaking pit heating and hot rolling scheduling in steel plants (Q2003439) (← links)
- A survey of scheduling with parallel batch (p-batch) processing (Q2076906) (← links)
- A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness (Q2456478) (← links)
- Performance evaluation of due-date based dispatching rules in dynamic scheduling of diffusion furnace (Q2656512) (← links)
- Exact Approaches for Single Machine Total Weighted Tardiness Batch Scheduling (Q5087720) (← links)