Pages that link to "Item:Q861201"
From MaRDI portal
The following pages link to Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time (Q861201):
Displaying 5 items.
- Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration (Q621032) (← links)
- Makespan minimization in machine dominated flowshop (Q708144) (← links)
- Reduction of permutation flowshop problems to single machine problems using machine dominance relations (Q1652025) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- A systematic literature review on no-idle flow shop scheduling problem (Q6130678) (← links)