Pages that link to "Item:Q868130"
From MaRDI portal
The following pages link to An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups (Q868130):
Displaying 25 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints (Q320637) (← links)
- A study of hybrid evolutionary algorithms for single machine scheduling problem with sequence-dependent setup times (Q337074) (← links)
- An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times (Q339586) (← links)
- Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness (Q398925) (← links)
- Neighborhood search procedures for single machine tardiness scheduling with sequence-dependent setups (Q428876) (← links)
- A GRASP based on DE to solve single machine scheduling problem with SDST (Q434179) (← links)
- ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness (Q670296) (← links)
- The reliable design of one-piece flow production system using fuzzy ant colony optimization (Q959512) (← links)
- A discrete differential evolution algorithm for the single machine total weighted tardiness problem with sequence dependent setup times (Q1000975) (← links)
- Efficient local search limitation strategy for single machine total weighted tardiness scheduling with sequence-dependent setup times (Q1652166) (← links)
- Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures (Q1688445) (← links)
- A hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup times (Q1761176) (← links)
- A variable neighborhood search for minimizing total weighted tardiness with sequence dependent setup times on a single machine (Q1762139) (← links)
- A BB\&R algorithm for minimizing total tardiness on a single machine with sequence dependent setup times (Q1928272) (← links)
- Effective IG heuristics for a single-machine scheduling problem with family setups and resource constraints (Q2294600) (← links)
- A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems (Q2327956) (← links)
- Scatter search for minimizing weighted tardiness in a single machine scheduling with setups (Q2403268) (← links)
- Beam search algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setups (Q2468493) (← links)
- A pseudo parallel ant algorithm with an adaptive migration controller (Q2518461) (← links)
- A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times (Q2519079) (← links)
- Multi Objective Optimization Using Ant Colonies (Q3613277) (← links)
- USING ANT COLONY OPTIMIZATION TO MINIMIZE THE FUZZY MAKESPAN AND TOTAL WEIGHTED FUZZY COMPLETION TIME IN FLOW SHOP SCHEDULING PROBLEMS (Q3638815) (← links)
- An iterated greedy algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times (Q5172564) (← links)
- Graph coloring approaches for a production planning problem with makespan and setup penalties in a product-wheel context (Q6559404) (← links)