Pages that link to "Item:Q869007"
From MaRDI portal
The following pages link to Scheduling in a three-machine robotic flexible manufacturing cell (Q869007):
Displaying 6 items.
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670) (← links)
- Pure cycles in flexible robotic cells (Q954029) (← links)
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell (Q1654361) (← links)
- Schedule-allocate and robust sequencing in three-machine robotic cell under breakdowns (Q2214792) (← links)
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times (Q2290581) (← links)
- Scheduling in robotic cells: process flexibility and cell layout (Q3533187) (← links)