Pages that link to "Item:Q877194"
From MaRDI portal
The following pages link to Machine scheduling with resource dependent processing times (Q877194):
Displaying 21 items.
- Approximate algorithms for unrelated machine scheduling to minimize makespan (Q747046) (← links)
- An approximation algorithm for identical parallel machine scheduling with resource dependent processing times (Q935202) (← links)
- Scheduling jobs with time-resource tradeoff via nonlinear programming (Q1040086) (← links)
- Algorithms for the unrelated parallel machine scheduling problem with a resource constraint (Q1653364) (← links)
- Approximation algorithms for scheduling on multi-core processor with shared speedup resources (Q1751153) (← links)
- Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources (Q1753460) (← links)
- Parallel machine scheduling with speed-up resources (Q1754306) (← links)
- Scheduling on two identical machines with a speed-up resource (Q1944144) (← links)
- A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions (Q2029954) (← links)
- Min-max controllable risk problems (Q2040608) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Scheduling with an orthogonal resource constraint (Q2350899) (← links)
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods (Q2356015) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- Task swapping networks in distributed systems (Q2874305) (← links)
- Approximation Algorithms for Unrelated Machine Scheduling with an Energy Budget (Q3004675) (← links)
- Online Scheduling on a CPU-GPU Cluster (Q4922108) (← links)
- Approximation Schemes for Machine Scheduling with Resource (In-)dependent Processing Times (Q4972675) (← links)
- Scheduling parallel dedicated machines with the speeding‐up resource (Q5393022) (← links)
- Min‐sum controllable risk problems with concave risk functions of the same value range (Q6065855) (← links)
- Scheduling unrelated parallel machine problem with multi-mode processing times and batch delivery cost (Q6105902) (← links)