Pages that link to "Item:Q880579"
From MaRDI portal
The following pages link to Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication (Q880579):
Displaying 6 items.
- A bi-objective approach for scheduling ground-handling vehicles in airports (Q342334) (← links)
- Jackson's semi-preemptive scheduling on a single machine (Q991363) (← links)
- A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival (Q991390) (← links)
- Computing lower and upper bounds for a large-scale industrial job shop scheduling problem (Q1011298) (← links)
- A batch-oblivious approach for complex job-shop scheduling problems (Q1695012) (← links)
- Rule-based scheduling in wafer fabrication with due date-based objectives (Q1761232) (← links)