Pages that link to "Item:Q940894"
From MaRDI portal
The following pages link to Fuzzy job shop scheduling with lot-sizing (Q940894):
Displaying 7 items.
- Depth-first heuristic search for the job shop scheduling problem (Q363574) (← links)
- Real-time production planning and control system for job-shop manufacturing: a system dynamics analysis (Q421712) (← links)
- Using metaheuristic and fuzzy system for the optimization of material pull in a push-pull flow logistics network (Q460499) (← links)
- A new dispatching rule based genetic algorithm for the multi-objective job shop problem (Q604936) (← links)
- Survey on fuzzy shop scheduling (Q1794871) (← links)
- Evolutionary tabu search for flexible due-date satisfaction in fuzzy job shop scheduling (Q2177824) (← links)
- Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops (Q2826667) (← links)