Pages that link to "Item:Q954926"
From MaRDI portal
The following pages link to Scheduling projects with heterogeneous resources to meet time and quality objectives (Q954926):
Displaying 14 items.
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- Workforce planning incorporating skills: state of the art (Q319002) (← links)
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- Personnel scheduling: models and complexity (Q541689) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A mathematical model for the management of a service center (Q636490) (← links)
- A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenance (Q723920) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- Resource constrained routing and scheduling: review and research prospects (Q1694813) (← links)
- Piecewise linear model for multiskilled workforce scheduling problems considering learning effect and project quality (Q1793043) (← links)
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems (Q1988965) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure (Q5171825) (← links)