Pages that link to "Item:Q955949"
From MaRDI portal
The following pages link to Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (Q955949):
Displaying 7 items.
- A branch and bound algorithm for the cyclic job-shop problem with transportation (Q339670) (← links)
- Multimodal processes rescheduling: cyclic steady states space approach (Q473600) (← links)
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670) (← links)
- A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints (Q693472) (← links)
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots (Q1042101) (← links)
- Cyclic scheduling in robotic flowshops with bounded work-in-process levels (Q2994797) (← links)
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times (Q3163706) (← links)