Pages that link to "Item:Q969520"
From MaRDI portal
The following pages link to A projective algorithm for preemptive open shop scheduling with two multiprocessor groups (Q969520):
Displaying 3 items.
- A hybrid imperialist competitive algorithm for minimizing makespan in a multi-processor open shop (Q1792291) (← links)
- On a conjecture for the university timetabling problem (Q2028068) (← links)
- Multi-objective open shop scheduling by considering human error and preventive maintenance (Q2307240) (← links)