Pages that link to "Item:Q989637"
From MaRDI portal
The following pages link to Simulation-based optimization for discharge/loading operations at a maritime container terminal (Q989637):
Displaying 8 items.
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals (Q319438) (← links)
- Hybrid evolutionary computation methods for quay crane scheduling problems (Q336440) (← links)
- A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints (Q513546) (← links)
- A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules (Q742501) (← links)
- Modeling and solving rich quay crane scheduling problems (Q1761126) (← links)
- Modelling and metaheuristic for gantry crane scheduling and storage space allocation problem in railway container terminals (Q1784912) (← links)
- An integrated berth allocation and yard assignment problem for bulk ports: Formulation and case study (Q2969974) (← links)
- Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity (Q6109309) (← links)