The following pages link to Robust scheduling and robustness measures for the discrete time/cost trade-off problem (Q992657):
Displaying 17 items.
- A float-path theory and its application to the time-cost tradeoff problem (Q305477) (← links)
- The impact of reserve duties on the robustness of a personnel shift roster: an empirical investigation (Q337610) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- A hybrid simulation-optimization approach for the robust discrete time/cost trade-off problem (Q1636886) (← links)
- An agency perspective for multi-mode project scheduling with time/cost trade-offs (Q1722976) (← links)
- Employee substitutability as a tool to improve the robustness in personnel scheduling (Q2014585) (← links)
- A fuzzy robustness measure for the scheduling of commissioned product development projects (Q2036560) (← links)
- A reduction tree approach for the discrete time/cost trade-off problem (Q2147020) (← links)
- Generating a robust baseline schedule for the robust discrete time/resource trade-off problem under work content uncertainty (Q2147061) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Determination of early warning time window for bottleneck resource buffer (Q2241213) (← links)
- Recent advances in robust optimization: an overview (Q2256312) (← links)
- Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures (Q2305019) (← links)
- Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs (Q3455883) (← links)
- Project scheduling cost optimization based on resource transfer costs and robustness (Q6065647) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- Tabu search for proactive project scheduling problem with flexible resources (Q6164385) (← links)