The following pages link to New trends in machine scheduling (Q1107428):
Displayed 13 items.
- Solving an integrated job-shop problem with human resource constraints (Q744642) (← links)
- A state-of-the-art review of parallel-machine scheduling research (Q919994) (← links)
- Resource-constrained job scheduling with recyclable resources (Q1129908) (← links)
- A global MILP model for FMS scheduling (Q1278123) (← links)
- Combinatorial optimization models for production scheduling in automated manufacturing systems (Q1278813) (← links)
- Generating the best \(K\) sequences in relocation problems (Q1309945) (← links)
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints. (Q1413824) (← links)
- Scheduling tasks on a flexible manufacturing machine to minimize tool change delays (Q1767682) (← links)
- Analysis of the twisting department at superior cable corporation: A case study (Q1809862) (← links)
- Scheduling a two-machine robotic cell: A solvable case (Q1897386) (← links)
- Scheduling flexible manufacturing cells using Tabu Search (Q3055220) (← links)
- Some results of the relocation problems with processing times and deadlines (Q3979692) (← links)
- An effective algorithm for flexible assembly job‐shop scheduling with tight job constraints (Q6092532) (← links)