Pages that link to "Item:Q1136692"
From MaRDI portal
The following pages link to Minimal quantity of operators for serving a homogeneous linear technological process (Q1136692):
Displayed 8 items.
- Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization (Q342414) (← links)
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670) (← links)
- Cyclic multiple-robot scheduling with time-window constraints using a critical path approach (Q856208) (← links)
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (Q955949) (← links)
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots (Q1042101) (← links)
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times (Q2290581) (← links)
- Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions (Q2434294) (← links)
- An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times (Q2466598) (← links)