Pages that link to "Item:Q1138217"
From MaRDI portal
The following pages link to Optimal control of a large turboalternator (Q1138217):
Displayed 10 items.
- Optimal operation of multireservoir power systems (Q1060998) (← links)
- Optimal long-term operation of a multi-reservoir power system for critical water conditions (Q1078066) (← links)
- Modelling and optimization of parallel reservoirs having nonlinear storage curves under critical water conditions for long-term regulation (Q1089295) (← links)
- Optimization of the production of hydroelectric power systems with a variable head (Q1093520) (← links)
- Minimum norm approach to optimal long-term operation of multireservoir power systems with specified monthly generation (Q1093521) (← links)
- Optimization of hydropower systems operation with a quadratic model (Q1109670) (← links)
- Realistic feedback control of turbogenerators (Q1158387) (← links)
- Optimal control of two interconnected turbogenerators (Q1165810) (← links)
- Long-term optimal operation of series parallel reservoirs for critical period with specified monthly generation and average monthly storage (Q1823136) (← links)
- Realistic feedback control of two interconnected turbogenerators (Q1836640) (← links)