Pages that link to "Item:Q1331620"
From MaRDI portal
The following pages link to Cyclic scheduling to minimize inventory in a batch flow line (Q1331620):
Displayed 10 items.
- Medium term production management for cyclic deliveries (Q655196) (← links)
- Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823) (← links)
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes (Q1331612) (← links)
- Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems (Q1725606) (← links)
- Assembly line balancing: what happened in the last fifteen years? (Q2140264) (← links)
- A classification of assembly line balancing problems (Q2371356) (← links)
- A survey on problems and methods in generalized assembly line balancing (Q2569060) (← links)
- Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a make-to-order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithm (Q2656500) (← links)
- A computational comparison of cyclical and non-cyclical control for stochastic production-inventory systems (Q3055350) (← links)
- Scheduling of Jobs on Dissimilar Parallel Machine Using Computational Intelligence Algorithms (Q3296266) (← links)