Pages that link to "Item:Q1341395"
From MaRDI portal
The following pages link to Vehicle scheduling in two-cycle flexible manufacturing systems (Q1341395):
Displaying 11 items.
- Exact and heuristic approaches to solve the Internet shopping optimization problem with delivery costs (Q326228) (← links)
- A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles (Q614066) (← links)
- Loop based facility planning and material handling (Q707078) (← links)
- Combinatorial optimization models for production scheduling in automated manufacturing systems (Q1278813) (← links)
- Scheduling with resource management in manufacturing systems (Q1331541) (← links)
- A multilevel machine and vehicle scheduling in a flexible manufacturing system (Q1921087) (← links)
- The undirected \(m\)-capacitated peripatetic salesman problem (Q2253380) (← links)
- Survey of research in the design and control of automated guided vehicle systems (Q2575559) (← links)
- Heuristiques pour le Problème du Vendeur<i>m</i>-Péripatétique (Q3621973) (← links)
- Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm (Q4674452) (← links)
- An improved approximation algorithm for a scheduling problem with transporter coordination (Q6204661) (← links)