The following pages link to Ton G. de Kok (Q1423347):
Displaying 32 items.
- (Q336650) (redirect page) (← links)
- Dynamic shortest path problems: hybrid routing policies considering network disruptions (Q336651) (← links)
- Vehicle routing problem with stochastic travel times including soft time windows and service costs (Q339568) (← links)
- Approximating multi-objective scheduling problems (Q502416) (← links)
- Optimal and heuristic policies for assemble-to-order systems with different review periods (Q724063) (← links)
- Estimating stock levels in periodic review inventory systems (Q1273098) (← links)
- The mixed and multi model line balancing problem: A comparison (Q1278119) (← links)
- Nervousness in inventory management: Comparison of basic control rules (Q1280117) (← links)
- On the \((R,s,Q)\) inventory model when demand is modelled as a compound Bernoulli process (Q1291671) (← links)
- Inventory control in multi-echelon divergent systems with random lead times (Q1304950) (← links)
- Ruin probabilities with compounding assets for discrete time finite horizon problems, independent period claim sizes and general premium structure. (Q1423348) (← links)
- Stock rationing in a continuous review two-echelon inventory model (Q1424919) (← links)
- A multi-server queueing model with locking (Q1610149) (← links)
- Setting optimal planned leadtimes in configure-to-order assembly systems (Q1622813) (← links)
- Generating outpatient chemotherapy appointment templates with balanced flowtime and makespan (Q1711478) (← links)
- A typology and literature review on stochastic multi-echelon inventory models (Q1749506) (← links)
- Integer programming models for mid-term production planning for high-tech low-volume supply chains (Q1749508) (← links)
- Assemble-to-order systems: a review (Q1753635) (← links)
- Evaluation of divergent \(N\)-echelon \((s,nQ)\)-policies under compound renewal demand (Q1884678) (← links)
- Lead time anticipation in supply chain operations planning (Q1936598) (← links)
- The simultaneous determination of the assignment of items to resources, the cycle times, and the reorder intervals in repetitive PCB assembly (Q1960332) (← links)
- Self-imposed time windows in vehicle routing problems (Q2018105) (← links)
- Long-term resource planning in the high-tech industry: capacity or inventory? (Q2030334) (← links)
- Direct versus indirect penalties for supply contracts in high-tech industry (Q2140156) (← links)
- Time-based service constraints for inventory systems with commitment lead time (Q2197155) (← links)
- Integrating nurse assignment in outpatient chemotherapy appointment scheduling (Q2215557) (← links)
- Approximate analysis of the delivery splitting model (Q3156653) (← links)
- An explicit analysis of the lead time syndrome: stability condition and performance evaluation (Q3183777) (← links)
- Multi-echelon multi-company inventory planning with limited information exchange (Q4658473) (← links)
- Optimal control policies for an inventory system with commitment lead time (Q5226164) (← links)
- Optimal FCFS allocation rules for periodic‐review assemble‐to‐order systems (Q5249468) (← links)
- Synchronization in a two‐supplier assembly system: Combining a fixed lead‐time module with capacitated m<scp>ake‐to‐order</scp> production (Q6077483) (← links)