Pages that link to "Item:Q1577474"
From MaRDI portal
The following pages link to Group technology approach to the open shop scheduling problem with batch setup times (Q1577474):
Displayed 5 items.
- A single machine carryover sequence-dependent group scheduling in PCB manufacturing (Q339574) (← links)
- Group-scheduling problems in electronics manufacturing (Q964869) (← links)
- A \(\frac 6 5\)-approximation algorithm for the two-machine routing open-shop problem on a two-node network (Q1779528) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- The routing open-shop problem on a network: complexity and approximation (Q2496075) (← links)