Pages that link to "Item:Q1652579"
From MaRDI portal
The following pages link to An effective heuristic algorithm for the partial shop scheduling problem (Q1652579):
Displaying 3 items.
- An effective heuristic algorithm for the partial shop scheduling problem (Q1652579) (← links)
- Analysis of variable neighborhood descent as a local search operator for total weighted tardiness problem on unrelated parallel machines (Q2297569) (← links)
- An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems (Q6659821) (← links)