Pages that link to "Item:Q1652634"
From MaRDI portal
The following pages link to Matheuristic approaches for parallel machine scheduling problem with time-dependent deterioration and multiple rate-modifying activities (Q1652634):
Displaying 10 items.
- Improved DE search for competing groups scheduling with deterioration effects (Q828669) (← links)
- Parallel machine scheduling with completion-time-based criteria and sequence-dependent deterioration (Q1634051) (← links)
- Matheuristics for a parallel machine scheduling problem with non-anticipatory family setup times: application in the offshore oil and gas industry (Q2027046) (← links)
- A matheuristic for parallel machine scheduling with tool replacements (Q2030722) (← links)
- Production, maintenance and resource scheduling: a review (Q2098022) (← links)
- Effects of OCRA parameters and learning rate on machine scheduling (Q2155133) (← links)
- Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop (Q2241320) (← links)
- Heuristics for flights arrival scheduling at airports (Q6071058) (← links)
- Two-agent single-machine scheduling with a rate-modifying activity (Q6087481) (← links)
- An optimization method for characterizing two groups of data (Q6187250) (← links)