Pages that link to "Item:Q1708531"
From MaRDI portal
The following pages link to A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering (Q1708531):
Displaying 11 items.
- A lot sizing model with advance payment and planned backordering (Q1730590) (← links)
- Innovative maintenance problem in a two-stage production-inventory system with imperfect processes (Q2178315) (← links)
- A sustainable economic production model: effects of quality and emissions tax from transportation (Q2195986) (← links)
- Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy (Q2419093) (← links)
- Modeling an inventory problem with random supply, inspection and machine breakdown (Q2425020) (← links)
- Optimizing production and maintenance for the service-oriented manufacturing supply chain (Q2675630) (← links)
- Profit maximization in an inventory system with time-varying demand, partial backordering and discrete inventory cycle (Q2675697) (← links)
- Replenishment policies for imperfect inventory system under natural idle time and shortages (Q3388822) (← links)
- Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage (Q4611479) (← links)
- Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm (Q5059407) (← links)
- A single-stage cleaner production system with waste management, reworking, preservation technology, and partial backlogging under inflation (Q6186582) (← links)