Pages that link to "Item:Q1761176"
From MaRDI portal
The following pages link to A hybrid genetic algorithm for the single machine scheduling problem with sequence-dependent setup times (Q1761176):
Displaying 7 items.
- Total completion time with makespan constraint in no-wait flowshops with setup times (Q296867) (← links)
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints (Q320637) (← links)
- ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness (Q670296) (← links)
- Effective IG heuristics for a single-machine scheduling problem with family setups and resource constraints (Q2294600) (← links)
- A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems (Q2327956) (← links)
- Multi-objective Optimal Design of Nonlinear Controls (Q2958242) (← links)