Pages that link to "Item:Q1762055"
From MaRDI portal
The following pages link to An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055):
Displaying 7 items.
- A diversified shuffled frog leaping: an application for parameter identification (Q274298) (← links)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation (Q336432) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems (Q781900) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags (Q1736833) (← links)
- Minimizing total weighted late work in the resource-constrained project scheduling problem (Q1792320) (← links)