Pages that link to "Item:Q1781549"
From MaRDI portal
The following pages link to Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times (Q1781549):
Displaying 16 items.
- Design of automated negotiation mechanisms for decentralized heterogeneous machine scheduling (Q320651) (← links)
- A novel approach to hedge and compensate the critical dimension variation of the developed-and-etched circuit patterns for yield enhancement in semiconductor manufacturing (Q337307) (← links)
- Bicriteria scheduling problem for unrelated parallel machines with release dates (Q342063) (← links)
- Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems (Q622134) (← links)
- Minimizing makespan and total completion time for parallel batch processing machines with non-identical job sizes (Q693407) (← links)
- Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops (Q857354) (← links)
- A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes (Q941534) (← links)
- Minimizing makespan for multi-spindle head machines with a mobile table (Q954031) (← links)
- A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival (Q991390) (← links)
- On the flexibility of a decision theory-based heuristic for single machine scheduling (Q1628046) (← links)
- A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server (Q1634053) (← links)
- Decomposition methods for cost and tardiness reduction in aircraft manufacturing flow lines (Q1634065) (← links)
- Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times (Q1652061) (← links)
- A batch-oblivious approach for complex job-shop scheduling problems (Q1695012) (← links)
- A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines (Q1743651) (← links)
- Rule-based scheduling in wafer fabrication with due date-based objectives (Q1761232) (← links)