Pages that link to "Item:Q1864434"
From MaRDI portal
The following pages link to Makespan estimation and order acceptance in batch process industries when processing times are uncertain (Q1864434):
Displaying 10 items.
- Pooling heterogeneous products for manufacturing environments (Q295883) (← links)
- Permutation flow shop scheduling with order acceptance and weighted tardiness (Q419558) (← links)
- Non-permutation flow shop scheduling with order acceptance and weighted tardiness (Q670790) (← links)
- A hybrid policy for order acceptance in batch process industries (Q850653) (← links)
- Order acceptance with weighted tardiness (Q878579) (← links)
- Order acceptance using genetic algorithms (Q1000954) (← links)
- Integrated production planning and order acceptance under uncertainty: a robust optimization approach (Q2355102) (← links)
- Measures of problem uncertainty for scheduling with interval processing times (Q2393127) (← links)
- A filtered-beam-search-based heuristic algorithm for flexible job-shop scheduling problem (Q3498886) (← links)
- Evaluation of the quantiles and superquantiles of the makespan in interval valued activity networks (Q6109311) (← links)