Pages that link to "Item:Q1869708"
From MaRDI portal
The following pages link to Fuzzy temporal characteristics of operations for project management on the network models basis (Q1869708):
Displayed 7 items.
- Solution of interval PERT/CPM network problems by a simplified tabular method (Q505096) (← links)
- A node-weighted rooted tree (NWRT) method to find project characteristics and critical path in a triangular fuzzy project network (Q725826) (← links)
- A simple approach to fuzzy critical path analysis in project networks (Q1031604) (← links)
- Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection (Q1730473) (← links)
- Analysis of critical paths in a project network with fuzzy activity times (Q2370365) (← links)
- Fuzzy critical path method based on ranking methods using hexagonal fuzzy numbers for decision making (Q5275877) (← links)
- Fuzzy approach for production planning and detailed scheduling in paints manufacturing (Q5438612) (← links)