Pages that link to "Item:Q1969764"
From MaRDI portal
The following pages link to The project scheduling problem with irregular starting time costs (Q1969764):
Displaying 8 items.
- An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236) (← links)
- Project scheduling with irregular costs: complexity, approximability, and algorithms (Q707495) (← links)
- Fuzzy project scheduling problem and its hybrid intelligent algorithm (Q967803) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- Project scheduling problem with stochastic activity duration times (Q2572685) (← links)
- On project scheduling with irregular starting time costs (Q5945382) (← links)