The following pages link to Dimitri Golenko-Ginzburg (Q204153):
Displaying 13 items.
- On-line production control using the EVPI approach (Q1261322) (← links)
- Resource constrained scheduling simulation model for alternative stochastic network projects. (Q1399956) (← links)
- Job-shop resource scheduling via simulating random operations (Q1404663) (← links)
- (Q3426429) (← links)
- On the Distribution of Activity Time in PERT (Q3787781) (← links)
- Allocation of Control Points in Stochastic Dynamic-Programming Models (Q3806966) (← links)
- A New Approach to the Activity-time Distribution in PERT (Q3818784) (← links)
- On-line control model for network construction projects (Q4367030) (← links)
- On-line Control Model for Cost-simulation Network Projects (Q4887786) (← links)
- (Q5287167) (← links)
- Semi-Automated Production Systems under Disturbances (Q5289672) (← links)
- A simulation factory control model under a chance constraint (Q5944016) (← links)
- Timing control points via simulation for production systems under random disturbances (Q5960773) (← links)