Pages that link to "Item:Q2158003"
From MaRDI portal
The following pages link to Berth allocation and quay crane assignment/scheduling problem under uncertainty: a survey (Q2158003):
Displayed 6 items.
- An improved genetic algorithm for the berth scheduling with ship-to-ship transshipment operations integrated model (Q6065602) (← links)
- Simultaneous operation of next-generation and traditional quay cranes at container terminals (Q6112695) (← links)
- Quay partitioning problem (Q6146630) (← links)
- Improved sequential insertion heuristics for berth allocation problems (Q6146631) (← links)
- Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition (Q6164635) (← links)
- Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model (Q6187236) (← links)