Pages that link to "Item:Q2378452"
From MaRDI portal
The following pages link to Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (Q2378452):
Displaying 3 items.
- Real-time production planning and control system for job-shop manufacturing: a system dynamics analysis (Q421712) (← links)
- Minimizing the weighted number of tardy jobs on multiple machines: a review (Q2358307) (← links)
- A fuzzy nonlinear programming approach for optimizing the performance of a four-objective fluctuation smoothing rule in a wafer fabrication factory (Q2375646) (← links)