Pages that link to "Item:Q2467255"
From MaRDI portal
The following pages link to Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times (Q2467255):
Displaying 19 items.
- Modeling the parallel machine scheduling problem with step deteriorating jobs (Q323474) (← links)
- Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness (Q547127) (← links)
- Single-machine scheduling with linear decreasing deterioration to minimize earliness penalties (Q638880) (← links)
- Some single-machine and flowshop scheduling problems with a non-linear deterioration function (Q660909) (← links)
- Single-machine scheduling with nonlinear deterioration (Q691413) (← links)
- Parallel-machine serial-batching scheduling with release times under the effects of position-dependent learning and time-dependent deterioration (Q829191) (← links)
- A tabu search heuristic for a sequence-dependent and time-dependent scheduling problem on a single machine (Q835634) (← links)
- A note on single-machine scheduling with decreasing time-dependent job processing times (Q967802) (← links)
- Batch scheduling of simple linear deteriorating jobs on a single machine to minimize makespan (Q1038382) (← links)
- Integrated scheduling on a batch machine to minimize production, inventory and distribution costs (Q1698887) (← links)
- A local search algorithm: minimizing makespan of deteriorating jobs with relaxed agreeable weights (Q1742901) (← links)
- Integrated scheduling of production and distribution for manufacturers with parallel batching facilities (Q1800447) (← links)
- Solution methods for scheduling problems with sequence-dependent deterioration and maintenance events (Q2242370) (← links)
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems (Q2305016) (← links)
- A note on flow shop scheduling problems with deteriorating jobs on no-idle dominant machines (Q2379563) (← links)
- A general variable neighborhood search for single-machine total tardiness scheduling problem with step-deteriorating jobs (Q2438422) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A Two-Stage Flexible Flowshop Problem with Deterioration (Q3511377) (← links)
- Minimizing the total waiting time of intermediate products in a manufacturing process (Q6088134) (← links)