Pages that link to "Item:Q2569085"
From MaRDI portal
The following pages link to Flexible flow shop scheduling with uniform parallel machines (Q2569085):
Displayed 8 items.
- Control methods for dynamic time-based manufacturing under customized product lead times (Q439459) (← links)
- Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprises (Q492824) (← links)
- Cyclic robot scheduling for 3D printer-based flexible assembly systems (Q829186) (← links)
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines (Q878937) (← links)
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines (Q881563) (← links)
- A Pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time (Q1792653) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)