Pages that link to "Item:Q2784051"
From MaRDI portal
The following pages link to Note. Satisfying Due Dates in Large Job Shops (Q2784051):
Displayed 4 items.
- Allocating job-shop manpower to minimize \(L_{\max}\): optimality criteria, search heuristics, and probabilistic quality metrics (Q336577) (← links)
- An effective lower bound on \(L_{\max}\) in a worker-constrained job shop (Q339585) (← links)
- The deployment scheduling analysis tool (DSAT) (Q1767112) (← links)
- Minimizing <i>L</i> <sub>max</sub> for large-scale, job-shop scheduling problems (Q4671351) (← links)