Pages that link to "Item:Q2795178"
From MaRDI portal
The following pages link to Solving a supply chain scheduling problem with non-identical job sizes and release times by applying a novel effective heuristic algorithm (Q2795178):
Displaying 6 items.
- Parallel-machine serial-batching scheduling with release times under the effects of position-dependent learning and time-dependent deterioration (Q829191) (← links)
- Parallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deterioration (Q2022187) (← links)
- Parallel-batching scheduling of deteriorating jobs with non-identical sizes and rejection on a single machine (Q2182772) (← links)
- Book review of: X. Liu et al., Optimization and management in manufacturing engineering. Resource collaborative optimization and management through the internet of things. (Q2416586) (← links)
- Multi-objective optimal scheduling of reconfigurable assembly line for cloud manufacturing (Q5268939) (← links)
- Multi-Objective Optimization and Multi-Attribute Decision Making for a Novel Batch Scheduling Problem Based on Mould Capabilities (Q5270518) (← links)