The following pages link to Yi Tan (Q309062):
Displaying 3 items.
- Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem (Q309064) (← links)
- A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines (Q1743651) (← links)
- A Schur's type volume comparison theorem (Q6520158) (← links)