Pages that link to "Item:Q3159654"
From MaRDI portal
The following pages link to Due date assignment using artificial neural networks under different shop floor control strategies (Q3159654):
Displayed 10 items.
- Online scheduling with immediate and reliable lead-time quotation (Q398920) (← links)
- Control methods for dynamic time-based manufacturing under customized product lead times (Q439459) (← links)
- Effective on-line algorithms for reliable due date quotation and large-scale scheduling (Q835600) (← links)
- Competitive analysis for make-to-order scheduling with reliable lead time quotation (Q2436673) (← links)
- Dynamic job shop scheduling for missed due date performance (Q3055352) (← links)
- Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling (Q3498906) (← links)
- Multi-agent-based workload control for make-to-order manufacturing (Q3533191) (← links)
- Using ensemble and metaheuristics learning principles with artificial neural networks to improve due date prediction performance (Q3605421) (← links)
- A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory (Q5385435) (← links)
- Development of a regression-based method with case-based tuning to solve the due date assignment problem (Q5444451) (← links)