Pages that link to "Item:Q319862"
From MaRDI portal
The following pages link to Integration of selecting and scheduling urban road construction projects as a time-dependent discrete network design problem (Q319862):
Displayed 5 items.
- A multi-objective integrated model for selecting, scheduling, and budgeting road construction projects (Q724091) (← links)
- Integrating link-based discrete credit charging scheme into discrete network design problem (Q1991119) (← links)
- Optimizing the selection and scheduling of multi-class projects using a Stackelberg framework (Q2184142) (← links)
- A quantitative approach for the long-term assessment of railway rapid transit network construction or expansion projects (Q2239999) (← links)
- Solving real-size stochastic railway rapid transit network construction scheduling problems (Q2669704) (← links)