Pages that link to "Item:Q321137"
From MaRDI portal
The following pages link to Aggregation heuristic for the open-pit block scheduling problem (Q321137):
Displaying 11 items.
- Comparative analysis of three metaheuristics for short-term open pit block sequencing (Q525065) (← links)
- A local branching heuristic for the open pit mine production scheduling problem (Q1752798) (← links)
- Linear models for stockpiling in open-pit mine production scheduling problems (Q1753425) (← links)
- Optimizing a mineral value chain with market uncertainty using Benders decomposition (Q1755250) (← links)
- A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem (Q2160495) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- Evolutionary approach for large-scale mine scheduling (Q2663534) (← links)
- Concurrent open-pit mine production and in-pit crushing–conveying system planning (Q5059445) (← links)
- Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach (Q5144773) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- Effective solution of the long-term open pit production planning problem using block clustering (Q6094355) (← links)