Pages that link to "Item:Q337088"
From MaRDI portal
The following pages link to Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088):
Displaying 9 items.
- Rescheduling on identical parallel machines with machine disruptions to minimize total completion time (Q322965) (← links)
- An efficient new heuristic for the hoist scheduling problem (Q342278) (← links)
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell (Q1654361) (← links)
- Multi-machine scheduling with interval constrained position-dependent processing times (Q1716992) (← links)
- An efficient bicriteria algorithm for stable robotic flow shop scheduling (Q1753515) (← links)
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times (Q2290581) (← links)
- A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking (Q2423281) (← links)
- Algorithms for single-machine scheduling problem with deterioration depending on a novel model (Q2628177) (← links)
- Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint (Q6133185) (← links)