The following pages link to Anis Gharbi (Q338858):
Displaying 17 items.
- An optimization-based heuristic for the machine reassignment problem (Q338859) (← links)
- Lower bounds for scheduling on identical parallel machines with heads and tails (Q596460) (← links)
- Energetic reasoning revisited: Application to parallel machine scheduling (Q835610) (← links)
- Optimal scheduling of a two-stage hybrid flow shop (Q857819) (← links)
- Jackson's semi-preemptive scheduling on a single machine (Q991363) (← links)
- Minimizing makespan on parallel machines subject to release dates and delivery times (Q1607981) (← links)
- Optimal parallel machines scheduling with availability constraints (Q1775061) (← links)
- An improved max-flow-based lower bound for minimizing maximum lateness on identical parallel machines (Q1870003) (← links)
- The nonpermutation flowshop scheduling problem: adjustment and bounding procedures (Q2336283) (← links)
- The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies (Q2356207) (← links)
- An approximate decomposition algorithm for scheduling on parallel machines with heads and tails (Q2433392) (← links)
- Fast lifting procedures for the bin packing problem (Q2581316) (← links)
- (Q2861515) (← links)
- (Q2861532) (← links)
- (Q2861538) (← links)
- Tight bounds for the identical parallel machine scheduling problem (Q3429035) (← links)
- Enhanced lower bounds and exact procedures for total completion time minimization in a two‐machine permutation flowshop with release dates (Q6066663) (← links)