Pages that link to "Item:Q342448"
From MaRDI portal
The following pages link to Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements (Q342448):
Displayed 7 items.
- A hybrid metaheuristic algorithm to optimise a real-world robotic cell (Q1652331) (← links)
- An integrated approach for scheduling health care activities in a hospital (Q1681540) (← links)
- A survey of job shop scheduling problem: the types and models (Q2146994) (← links)
- A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking (Q2423281) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- Efficient algorithms for flexible job shop scheduling with parallel machines (Q6093557) (← links)
- Heuristic and metaheuristic procedures for the buffer sizing problem in parallel assembly lines balancing problem with multi-line workstations and different cycle times (Q6106588) (← links)