Pages that link to "Item:Q3990983"
From MaRDI portal
The following pages link to JIT purchasing and setup reduction in an integrated inventory model (Q3990983):
Displayed 8 items.
- Optimal setup time reduction for a single product with dynamic demands (Q1127154) (← links)
- Dynamic setup reduction in production lot sizing with nonconstant deterministic demand (Q1266750) (← links)
- Optimal production cycles, procurement schedules, and joint investment in an imperfect production system (Q1278120) (← links)
- Joint investment in quality improvement and setup reduction (Q1892664) (← links)
- A quantitative approach for scheduling activities to reduce set-up in multiple machine lines (Q2467267) (← links)
- Investing in ordering cost reduction for integrated inventory systems (Q2766124) (← links)
- Effects of WIP inventories on integrated production lot sizing in cellular manufacturing (Q4394250) (← links)
- A note on the problem of scheduling a flexible manufacturing system for Just-in-time customers (Q4399001) (← links)