Pages that link to "Item:Q4230095"
From MaRDI portal
The following pages link to An optimal control model for continuous time production and setup scheduling (Q4230095):
Displayed 5 items.
- Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP) (Q1291708) (← links)
- Analytical study on multi-product production planning with outsourcing (Q1761131) (← links)
- Optimal control of assembling complexes under predetermined maintenance conditions (Q1819269) (← links)
- Efficient scheduling of consumer goods manufacturing processes in the continuous time domain. (Q1868819) (← links)
- Application of maximum principle to optimization of production and storage costs (Q5097081) (← links)