Pages that link to "Item:Q439458"
From MaRDI portal
The following pages link to An exact approach for single machine subproblems in shifting bottleneck procedures for job shops with total weighted tardiness objective (Q439458):
Displaying 4 items.
- An enhanced branch-and-bound algorithm for the talent scheduling problem (Q322481) (← links)
- Shifting bottleneck scheduling for total weighted tardiness minimization -- a computational evaluation of subproblem and re-optimization heuristics (Q342173) (← links)
- A meta-heuristic to solve the just-in-time job-shop scheduling problem (Q2028835) (← links)
- Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains (Q2355078) (← links)