The following pages link to (Q4719334):
Displayed 6 items.
- Optimal on-line algorithms to minimize makespan on two machines with resource augmentation (Q927393) (← links)
- On-line scheduling with tight deadlines. (Q1401244) (← links)
- Minimizing the maximum starting time on-line (Q1763375) (← links)
- A tighter extra-resource analysis of online deadline scheduling (Q1781800) (← links)
- Semi-clairvoyant scheduling (Q1887092) (← links)
- Scheduling in the dark (Q5918075) (← links)