Pages that link to "Item:Q4932891"
From MaRDI portal
The following pages link to The optimization of road building schedule based on budget restriction (Q4932891):
Displaying 3 items.
- Integration of selecting and scheduling urban road construction projects as a time-dependent discrete network design problem (Q319862) (← links)
- A multi-objective integrated model for selecting, scheduling, and budgeting road construction projects (Q724091) (← links)
- Solving real-size stochastic railway rapid transit network construction scheduling problems (Q2669704) (← links)