Pages that link to "Item:Q5292365"
From MaRDI portal
The following pages link to Integrated vendor--buyer inventory system with sublot sampling inspection policy and controllable lead time (Q5292365):
Displaying 6 items.
- Fuzzy mixture two warehouse inventory model involving fuzzy random variable lead time demand and fuzzy total demand (Q301162) (← links)
- Novel solution method for inventory models with stochastic demand and defective units (Q2209650) (← links)
- Computational procedure of optimal inventory model involving controllable backorder rate and variable lead time with defective units (Q2935095) (← links)
- Enhancing supply chain performance with improved order-control policies (Q3063818) (← links)
- An alternative simple solution algorithm of an inventory model with fixed and variable lead time crash costs under unknown demand distribution (Q5168736) (← links)
- Lot sizing and unequal-sized shipment policy for an integrated production-inventory system (Q5410836) (← links)