Pages that link to "Item:Q5428738"
From MaRDI portal
The following pages link to Single machine multi-product capacitated lot sizing with sequence-dependent setups (Q5428738):
Displaying 12 items.
- Modeling lotsizing and scheduling problems with sequence dependent setups (Q297372) (← links)
- A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem (Q319274) (← links)
- On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay (Q342563) (← links)
- Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups (Q539458) (← links)
- Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics (Q547140) (← links)
- Multiple machine continuous setup lotsizing with sequence-dependent setups (Q616801) (← links)
- Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions (Q635174) (← links)
- Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum (Q732896) (← links)
- Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration (Q983631) (← links)
- The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model (Q1664892) (← links)
- The capacitated lot-sizing and energy efficient single machine scheduling problem with sequence dependent setup times and costs in a closed-loop supply chain network (Q6099414) (← links)
- Valid inequalities and extended formulations for lot-sizing and scheduling problem with sequence-dependent setups (Q6113320) (← links)